« Primary Nameserver Down (Resolved)Atlas Offline - DDoS (Resolved) »

Xen HV3 Scheduled Maintenance (Resolved)

July 16, 2012 at 1:05 PM

We are performing an upgrade to the Xen HV3 hardware configuration, as the first in a line of multiple hypervisor upgrades which will provide RAM upgrades for the currently available VPS plans (if you are not on HV3, be patient, upgrades are coming to all hypervisors soon :)). Downtime is expected to be around 20-30 minutes, and occur on Thursday morning 7/19/2012 between 12:01AM and 4:00AM CDT.

07/19/2012

The server upgrade has been completed at this time.